United Warwick Service Station


IN PROGRESS


United Petroleum have contracted Linkbuild Construction for the design and construction of a new service station in Warwick, Gold Coast. The project is being totally managed by the Linkbuild Project team and includes the following progress:

  • Demolition of an existing [ageing] petrol station; including the decommissioning and safe removal of underground petrol storage tanks.

  • Tilt panels cast on site and craned into position.

  • Infrastructure relocation to accommodate new buildings.

  • Installation of underground bulk fuel storage tanks.

  • Structural steel canopies constructed on ground and raised with dual crane lift which increased installation efficiency and decreased safety risk with on ground assembly.

  • Storm water treatment system; SPEL Puraceptor® (hydrocarbon separator) to treat storm water before discharging from site.


All current in progress activities have and continue to meet the high safety standards and requirements outlined for the project.

#linkbuild #commercialconstruction #unitedfuel #safety #goldcoastconstruction #brisbaneconstruction #projectmanagement

LinkBuild Construction Gold Coast Office

Unit 6/93 Ashmore Road , Bundall, QLD 4217

 

Office: (07) 5554 5079

Email: admin@linkbuild.com.au

Office Hours: Mon-Fri 8am - 5pm

LinkBuild Construction Perth Office

2 Victoria Ave, Perth, WA 6000

Office: (08) 9287 0800

  • Black LinkedIn Icon
  • Black Instagram Icon
  • Black Facebook Icon

© 2020 Linkbuild Construction.